Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,275
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2508 # 08 Y:2025 | 08 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,663 | $48,183 | n/a |
LS2508 # 03 Y:2025 | 03 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $9,000 | $25,000 | n/a |
LS2508 # 02 Y:2025 | 02 | 2025 | INSTALL SUB-METERING EQUIPMENT | $3,313 | $3,000 | n/a |
LS2508 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,510 | $10,600 | n/a |
LS2508 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,709 | $16,949 | n/a |
LS2508 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $771 | $675 | n/a |
LS2508 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,572 | $160,992 | n/a |
LS2508 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,488 | $5,190 | n/a |
SU0565 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,157 | $7,850 | n/a |
SU0565 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $965 | $54 | n/a |
SU0565 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,336 | $0 | n/a |
SU0565 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,849 | $329 | n/a |
SU0565 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,298 | $6,264 | n/a |
SU0565 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,907 | $383,075 | n/a |
SU0565 # 02 Y:2024 | 02 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,793 | $0 | n/a |
SU0565 # 06 Y:2024 | 06 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $180,000 | $160,000 | n/a |
SU0565 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $566 | $906 | n/a |
SU0565 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,877 | $0 | n/a |
MS0437 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,017 | $458,990 | n/a |
MS0437 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $272 | $2,237 | n/a |
MS0437 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $288,884 | $300,000 | n/a |
MS0437 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $147 | $0 | n/a |
WV0672 # 10 Y:2024 | 10 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $797 | $1,579 | n/a |
WV0672 # 02 Y:2024 | 02 | 2024 | USE EVAPORATION TO CONCENTRATE MATERIAL | $24,278 | $31,216 | n/a |
WV0672 # 03 Y:2024 | 03 | 2024 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $20,948 | $26,406 | n/a |