IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,249

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0119 # 06 Y:2021 06 2021 IMPROVE LUBRICATION PRACTICES $21,048 $10,400 Not Implemented
CW0119 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,837 $1,000 Implemented
UD1033 # 01 Y:2022 01 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $633 $0 Not Implemented
UD1033 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,185 $2,250 Not Implemented
UD1033 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $555 $676 Not Implemented
UD1033 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,955 $6,000 Implemented
UD1033 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,775 $800 Not Implemented
UD1033 # 06 Y:2022 06 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,359 $4,615 Not Implemented
IP0147 # 01 Y:2021 01 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $528 $0 Not Implemented
IP0147 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,540 $15 Implemented
IP0147 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,380 $115 Implemented
IP0147 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,949 $4,080 Implemented
IP0147 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,770 $3,499 Implemented
IP0147 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39 $90 Implemented
SF0568 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $40,609 $0 Not Implemented
SF0568 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,914 $0 Implemented
SF0568 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,183 $400 Not Implemented
SF0568 # 04 Y:2021 04 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,048 $860 Implemented
SF0568 # 05 Y:2021 05 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $26,520 $43,936 Not Implemented
SF0568 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,828 $70,690 Implemented
SF0567 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $20,821 $0 Not Implemented
SF0567 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $0 Implemented
SF0567 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $3,350 Implemented
SF0567 # 04 Y:2021 04 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $24,340 $29,296 Not Implemented
SF0567 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,660 $40,195 Implemented