IAC logo
IAC Assessment: MU0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MU0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Michigan State University
Assessment Year 2022
Principal Product piston rings and engine plates
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592 - Carburetors, Pistons, Rings, Valves
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 200,000
Annual Production 49,920,000 Pieces
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $917,015 11,928,874 kWh $0.08
Electricity Demand $72,832 30,347 kW-months/year $2.40
Electricity Fees $100,898 - $ -
Natural Gas $203,434 75,205 MMBtu $2.71
TOTAL ENERGY COSTS $1,294,180
RECOMMENDED SAVINGS* $14,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,726
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$9,128
Cost:
-
$9,128 113,708 - - - - - - $9,128
113,708
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$3,019
Cost:
$855
$3,008 37,604 $10 4 - - - - $3,008
37,604
kWh
$10
4
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,187
Cost:
-
- - - - - - $1,187 439 -
-
kWh
-
-
kW-months/year
-
-
$
$1,187
439
MMBtu
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$821
Cost:
$90
- - $227 94 $595 - - - -
-
kWh
$227
94
kW-months/year
$595
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$352
Cost:
-
$352 4,380 - - - - - - $352
4,380
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$348
Cost:
$795
$348 4,336 - - - - - - $348
4,336
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,854
Cost:
$1,740
$12,836 160,028 $237 99 $595 - $1,187 439 $12,836
160,028
kWh
$237
99
kW-months/year
$595
-
$
$1,187
439
MMBtu
TOTAL IMPLEMENTED Savings:
$5,726
Cost:
$1,740
$3,708 46,320 $237 99 $595 - $1,187 439 $3,708
46,320
kWh
$237
99
kW-months/year
$595
-
$
$1,187
439
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas