IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0526 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,267 $1,927 Implemented
LE0526 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,461 $2,205 Implemented
LE0526 # 04 Y:2022 04 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,817 $1,200 Not Implemented
LE0526 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,900 Implemented
LE0526 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,615 $3,540 Implemented
LE0526 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $1,800 Not Implemented
LE0526 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,661 $48,235 Implemented
LE0526 # 09 Y:2022 09 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $37,269 $125,000 Not Implemented
LE0526 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $671 $0 Implemented
RU0154 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,405 $2,500 Implemented
RU0154 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $1,001 $300 Implemented
RU0154 # 04 Y:1992 04 1992 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $889 $150 Implemented
RU0154 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,622 $0 Implemented
RU0154 # 01 Y:1992 01 1992 IMPROVE LUBRICATION PRACTICES $351 $800 Implemented
ST0050 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,436 $567 Not Implemented
ST0050 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $415 $100 Implemented
ST0050 # 03 Y:1985 03 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $179 $122 Implemented
ST0050 # 04 Y:1985 04 1985 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $279 $500 Implemented
ST0050 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $49 $0 Implemented
ST0050 # 06 Y:1985 06 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $473 $917 Not Implemented
ST0050 # 07 Y:1985 07 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,195 $0 Implemented
ST0050 # 08 Y:1985 08 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $358 $63 Not Implemented