Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
130
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0017 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $277 | $220 | Implemented |
UU0017 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $694 | $700 | Implemented |
UU0017 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $519 | $1,815 | Not Implemented |
UU0014 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $620 | $440 | Implemented |
UU0014 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $192 | $300 | Not Implemented |
UU0014 # 04 Y:2001 | 04 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $602 | $1,195 | Not Implemented |
UU0014 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,374 | $9,639 | Not Implemented |
UU0014 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,319 | $60 | Implemented |
WI0405 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,749 | $2,000 | Implemented |
WI0405 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $640 | Not Implemented |
WI0405 # 07 Y:2001 | 07 | 2001 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $759 | $0 | Not Implemented |
WI0405 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,839 | $9,403 | Not Implemented |
WI0405 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,216 | $500 | Implemented |
WI0405 # 04 Y:2001 | 04 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,138 | $0 | Implemented |
WI0405 # 03 Y:2001 | 03 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,585 | $11,000 | Not Implemented |
WI0405 # 01 Y:2001 | 01 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $5,787 | $4,500 | Implemented |
WI0405 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $269 | $570 | Not Implemented |
TA0010 # 08 Y:2001 | 08 | 2001 | INSTALL OCCUPANCY SENSORS | $1,319 | $460 | Implemented |
TA0010 # 07 Y:2001 | 07 | 2001 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,450 | $333 | Not Implemented |
TA0010 # 06 Y:2001 | 06 | 2001 | INSULATE FEEDWATER TANK | $2,564 | $181 | Implemented |
TA0010 # 02 Y:2001 | 02 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $29,986 | $11,995 | Implemented |
TA0010 # 05 Y:2001 | 05 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,688 | $225 | Not Implemented |
TA0010 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,834 | $40 | Implemented |
TA0010 # 01 Y:2001 | 01 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $69,210 | $0 | Implemented |
TA0010 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $755 | $984 | Implemented |