IAC logo
IAC Assessment: TA0010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2001
Principal Product Precision parts machining and fabrication
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 241,000
Annual Production 2,754,737 Pieces
Production Hrs. Annual 6,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $537,353 10,430,600 kWh $0.05
Electricity Demand $157,622 21,631 kW-months/year $7.29
Electricity Fees $22,352 - $ -
Natural Gas $89,255 40,580 MMBtu $2.20
TOTAL ENERGY COSTS $806,582
RECOMMENDED SAVINGS* $123,536 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,398
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$69,210
Cost:
-
$69,210 1,502,931 - - - - $69,210
1,502,931
kWh
-
-
kW-months/year
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$29,986
Cost:
$11,995
- - - - $29,986 - -
-
kWh
-
-
kW-months/year
$29,986
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,834
Cost:
$40
$7,834 170,088 - - - - $7,834
170,088
kWh
-
-
kW-months/year
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$6,210
Cost:
-
- - - - $6,210 - -
-
kWh
-
-
kW-months/year
$6,210
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,688
Cost:
$225
$2,741 59,520 $947 133 - - $2,741
59,520
kWh
$947
133
kW-months/year
-
-
$
06: 2.2123 INSULATE FEEDWATER TANK Savings:
$2,564
Cost:
$181
$2,564 55,686 - - - - $2,564
55,686
kWh
-
-
kW-months/year
-
-
$
07: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,450
Cost:
$333
$1,450 31,476 - - - - $1,450
31,476
kWh
-
-
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,319
Cost:
$460
$1,319 28,639 - - - - $1,319
28,639
kWh
-
-
kW-months/year
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$755
Cost:
$984
$523 11,348 $232 32 - - $523
11,348
kWh
$232
32
kW-months/year
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$520
Cost:
-
$335 7,271 $185 26 - - $335
7,271
kWh
$185
26
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$123,536
Cost:
$14,218
$85,976 1,866,959 $1,364 191 $36,196 - $85,976
1,866,959
kWh
$1,364
191
kW-months/year
$36,196
-
$
TOTAL IMPLEMENTED Savings:
$118,398
Cost:
$13,660
$81,785 1,775,963 $417 58 $36,196 - $81,785
1,775,963
kWh
$417
58
kW-months/year
$36,196
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees