IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0180 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $32 Implemented
IP0180 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,666 $1,830 Implemented
IP0180 # 04 Y:2023 04 2023 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $4,518 $5,490 Not Implemented
IP0180 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,597 $3,719 Not Implemented
IP0180 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,621 $36,055 Implemented
IP0180 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,444 $26,075 Not Implemented
IP0180 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,258 $0 Implemented
UL2314 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,821 $13,461 Not Implemented
UL2314 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,061 $4,320 Implemented
UL2314 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,358 $0 Not Implemented
UL2314 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,576 $15,000 Not Implemented
UL2314 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,470 $15,600 Not Implemented
UL2314 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,095 $476,338 Not Implemented
UL2314 # 08 Y:2023 08 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,765 $100 Implemented
UL2314 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,398 $6,825 Not Implemented
UL2314 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $29,804 $13,936 Not Implemented
CI0024 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,369 $0 n/a
CI0024 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,658 $3,828 n/a
CI0024 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,432 $2,000 n/a
CI0024 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $21,490 $159,041 n/a
CI0024 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,729 $0 n/a
CI0024 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,179 $7,910 n/a
CI0024 # 07 Y:2023 07 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,423 $15,000 n/a
CI0024 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,298 $1,800 n/a
CI0024 # 09 Y:2023 09 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,090 $6,000 n/a