Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2510 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $71,181 | $417,175 | n/a |
UL2510 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,769 | $3,240 | n/a |
UL2510 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,413 | $9,750 | n/a |
UL2510 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $1,506 | $185 | n/a |
MS0450 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,775 | $1,740 | n/a |
MS0450 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $44,435 | $122,808 | n/a |
UD1117 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,029 | $4,975 | n/a |
UD1117 # 05 Y:2025 | 05 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,113 | $0 | n/a |
UD1117 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,183 | $15,550 | n/a |
UD1117 # 03 Y:2025 | 03 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,839 | $947 | n/a |
UD1117 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $0 | n/a |
UD1117 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,656 | $1,015 | n/a |
MS0450 # 01 Y:2025 | 01 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $16,450 | $19,723 | n/a |
MS0450 # 03 Y:2025 | 03 | 2025 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $9,485 | $0 | n/a |
MS0450 # 04 Y:2025 | 04 | 2025 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $14,625 | $43,769 | n/a |
MS0450 # 05 Y:2025 | 05 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,199 | $5,414 | n/a |
UU0275 # 03 Y:2025 | 03 | 2025 | USE AUTOMATIC FLOW CONTROL | $1,516 | $5,258 | n/a |
UU0275 # 06 Y:2025 | 06 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $4,820 | $8,740 | n/a |
UU0275 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $12,307 | $10,880 | n/a |
UU0275 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,066 | $2,066 | n/a |
UU0275 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,030 | $15,960 | n/a |
UU0275 # 02 Y:2025 | 02 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $33,900 | $8,025 | n/a |
NT0043 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,674 | $31,572 | n/a |
NT0043 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $146,777 | $515,060 | n/a |
NT0043 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $17,336 | $25,437 | n/a |