Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 3594 | Fluid Power Pumps And Motors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0041 # 02 Y:2024 | 02 | 2024 | AIR CONDITION ONLY SPACE NECESSARY | $8,109 | $0 | n/a |
CC0041 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $4,448 | $6,882 | n/a |
CC0041 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,256 | $0 | n/a |
CC0041 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $180 | $308 | n/a |
CC0041 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,484 | $0 | n/a |
CC0041 # 07 Y:2024 | 07 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $563 | $0 | n/a |
CC0041 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,392 | $0 | n/a |
CC0041 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $6,020 | n/a |
UD1086 # 04 Y:2024 | 04 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,233 | $0 | n/a |
UD1086 # 09 Y:2024 | 09 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,459 | $7,620 | n/a |
UD1086 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $54 | $0 | n/a |
UD1086 # 01 Y:2024 | 01 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $12,814 | $0 | n/a |
UD1086 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,780 | $0 | n/a |
UD1086 # 02 Y:2024 | 02 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $573 | $0 | n/a |
UD1086 # 10 Y:2024 | 10 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,429 | $25,300 | n/a |
UD1086 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $561 | $0 | n/a |
UD1086 # 11 Y:2024 | 11 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,817 | $0 | n/a |
UD1086 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,965 | $1,068 | n/a |
UD1086 # 05 Y:2024 | 05 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,962 | $7,238 | n/a |
IP0180 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,258 | $0 | Implemented |
IP0180 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,158 | $32 | Implemented |
IP0180 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,666 | $1,830 | Implemented |
IP0180 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,597 | $3,719 | Not Implemented |
IP0180 # 04 Y:2023 | 04 | 2023 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $4,518 | $5,490 | Not Implemented |
IP0180 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,621 | $36,055 | Implemented |