Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0533 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,903 $6,154 Not Implemented
LE0533 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,998 $18,621 Not Implemented
LE0533 # 04 Y:2022 04 2022 BURN A LESS EXPENSIVE GRADE OF FUEL $24,359 $62,500 Not Implemented
LE0533 # 03 Y:2022 03 2022 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $21,231 $50,000 Not Implemented
LE0533 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,161 $4,100 Not Implemented
LE0533 # 02 Y:2022 02 2022 USE RADIANT HEATER FOR SPOT HEATING $3,206 $3,500 Not Implemented
LE0521 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,738 $0 Implemented
LE0521 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $1,200 Implemented
LE0521 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $27,881 $128,814 Implemented
LE0521 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,021 $800 Not Implemented
LE0521 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,148 $2,956 Not Implemented
LE0521 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,237 $11,000 Not Implemented
LE0521 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,127 $1,200 Implemented
LE0521 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $35 Implemented
LE0403 # 12 Y:2015 12 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $120 $612 Not Implemented
LE0403 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,928 $5,333 Not Implemented
LE0403 # 11 Y:2015 11 2015 RECOVER WASTE HEAT FROM EQUIPMENT $489 $1,750 Not Implemented
LE0403 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $3,075 Not Implemented
LE0403 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,886 $0 Implemented
LE0403 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,107 $25 Implemented
LE0403 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $113 Implemented
LE0403 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,849 $3,330 Implemented
LE0403 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $560 $520 Not Implemented
LE0403 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $596 $600 Not Implemented
LE0403 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $522 $625 Not Implemented