IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,791

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
SD0564 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $17,517 $86,400 Implemented
WM0120 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,818 $35,678 Implemented
WM0120 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $2,251 Implemented
MZ0252 # 01 Y:2018 01 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $4,011 $540 Implemented
MZ0252 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,478 $32,500 Implemented
MZ0252 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,159 $0 Implemented
MZ0252 # 05 Y:2018 05 2018 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $65,281 $50,000 Implemented
MZ0252 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $50 Implemented
MZ0245 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,959 $47,658 Implemented
MZ0245 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,450 $2,183 Implemented
MZ0245 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,755 $150 Implemented
MZ0245 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $3,321 $1,300 Implemented
MZ0245 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $3,089 $2,730 Implemented
MZ0245 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,202 $500 Implemented
MZ0245 # 11 Y:2017 11 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,076 $250 Implemented
MI0321 # 01 Y:2017 01 2017 USE OPTIMUM THICKNESS INSULATION $17,954 $21,920 Implemented
MI0321 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,816 $7,589 Implemented
MI0321 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,233 $3,600 Implemented
MI0321 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,256 $1,660 Implemented
MI0321 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $1,612 $1,914 Implemented
MI0321 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $400 Implemented
MI0320 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $58,406 $120 Implemented
MI0320 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,871 $1,660 Implemented
MI0320 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,560 $27,600 Implemented