Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2019 |
Principal Product | Electrical and Fiber Optics Connectors |
NAICS | 334417 - Electronic Connector Manufacturing |
SIC | 3678 - Electronic Connectors |
Sales | $100,000,000-$500,000,000 |
# of Employees | 345 |
Plant Area (Sq.Ft.) | 156,000 |
Annual Production | 9,600 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | FL |
View Case Study |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $126,484 | 2,840,160 | kWh | $0.04 |
Electricity Demand | $78,027 | 5,863 | kW-months/year | $13.31 |
Electricity Fees | $37,071 | - | $ | - |
TOTAL ENERGY COSTS | $241,582 | |||
RECOMMENDED SAVINGS* | $79,804 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,230 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $20,647 Cost: $100,030 |
$14,685 | 326,339 | $5,962 | 448 |
$14,685 326,339 kWh |
$5,962 448 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $18,921 Cost: $27,048 |
$13,451 | 298,902 | $5,470 | 411 |
$13,451 298,902 kWh |
$5,470 411 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $17,548 Cost: $3,600 |
$17,548 | 389,952 | - | - |
$17,548 389,952 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,278 Cost: $17,214 |
$7,192 | 159,819 | $4,086 | 307 |
$7,192 159,819 kWh |
$4,086 307 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $5,773 Cost: $9,476 |
$4,109 | 91,315 | $1,664 | 125 |
$4,109 91,315 kWh |
$1,664 125 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,612 Cost: $160 |
$1,853 | 41,181 | $759 | 57 |
$1,853 41,181 kWh |
$759 57 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,880 Cost: $1,446 |
$1,201 | 26,699 | $679 | 51 |
$1,201 26,699 kWh |
$679 51 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,145 Cost: $1,980 |
$812 | 18,035 | $333 | 25 |
$812 18,035 kWh |
$333 25 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $79,804 Cost: $160,954 |
$60,851 | 1,352,242 | $18,953 | 1,424 | $60,851 1,352,242 kWh |
$18,953 1,424 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,230 Cost: $122,984 |
$42,090 | 935,326 | $11,140 | 837 | $42,090 935,326 kWh |
$11,140 837 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||