IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0211 # 01 Y:2024 01 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,114 $700 Implemented
WM0211 # 02 Y:2024 02 2024 USE RADIANT HEATER FOR SPOT HEATING $5,517 $16,193 Not Implemented
WM0211 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,617 $9,500 Implemented
WM0211 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $150 Implemented
WM0211 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $345 Implemented
WM0211 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $0 Not Implemented
LE0557 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $279,544 $0 n/a
LE0557 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $87,150 $3,000 n/a
LE0557 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,494 $100 n/a
LE0557 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,783 $9,500 n/a
LE0557 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197,906 $323,780 n/a
LE0557 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $291,977 $600,000 n/a
LE0557 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,463 $29,000 n/a
LE0557 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,250 $37,000 n/a
MI0434 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $29,836 $550 Implemented
MI0434 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,559 $12,210 Not Implemented
MI0434 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $14,048 $0 Implemented
MI0434 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,225 $2,000 Implemented
MI0434 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,323 $7,394 Implemented
MI0434 # 06 Y:2023 06 2023 REPLACE TREATED WATER WITH WELL / SURFACE WATER $3,200 $3,460 Not Implemented
MI0434 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $2,333 $750 Not Implemented
MI0434 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,530 $960 Implemented
SU0544 # 01 Y:2023 01 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,993 $0 Implemented
SU0544 # 02 Y:2023 02 2023 DISCONNECT BALLASTS $3,711 $0 Not Implemented
SU0544 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,171 $0 Implemented