Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

504

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0432 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,236 $15,000 n/a
AS0426 # 09 Y:2006 09 2006 USE SOLAR HEAT TO HEAT WATER $3,172 $14,400 Not Implemented
AS0426 # 08 Y:2006 08 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,590 $20,832 Not Implemented
AS0426 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $15,085 Implemented
AS0426 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,221 $1,000 Implemented
AS0426 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,172 $2,000 Not Implemented
AS0426 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $7,727 $5,500 Not Implemented
AS0426 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $8,267 $2,077 Implemented
AS0426 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,823 $500 Implemented
AS0426 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,102 $17,458 Not Implemented
AS0408 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,267 $3,000 Not Implemented
AS0408 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,575 $14,371 Not Implemented
AS0408 # 04 Y:2005 04 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,761 $24,575 Not Implemented
AS0408 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,472 $1,000 Not Implemented
AS0408 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,937 $38,229 Not Implemented
AS0408 # 01 Y:2005 01 2005 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $505,076 $214,240 Not Implemented
AS0396 # 05 Y:2005 05 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $912 $1,000 Not Implemented
AS0396 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,749 $1,000 Not Implemented
AS0396 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,877 $5,000 Not Implemented
AS0396 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $107 $50 Not Implemented
AS0396 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,302 $1,000 Not Implemented
AS0396 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $474 $150 Not Implemented
AS0396 # 07 Y:2005 07 2005 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $8,063 $3,000 Not Implemented
AS0390 # 01 Y:2004 01 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,500 $80 Implemented
AS0390 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $23,750 Not Implemented