IAC logo
IAC Assessment: AS0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2006
Principal Product Printed circuit boards
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 180,000
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $697,736 6,679,462 kWh $0.10
Electricity Demand $61,550 5,796 kW-months/year $10.62
Natural Gas $28,886 31,921 MMBtu $0.90
TOTAL ENERGY COSTS $788,172
RECOMMENDED SAVINGS* $61,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,850
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$10,102
Cost:
$17,458
$2,463 23,568 $7,639 673 - - $2,463
23,568
kWh
$7,639
673
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,823
Cost:
$500
$8,282 79,250 $1,541 144 - - $8,282
79,250
kWh
$1,541
144
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,267
Cost:
$2,077
- - - - $8,267 214 -
-
kWh
-
-
kW-months/year
$8,267
214
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,727
Cost:
$5,500
$6,514 62,332 $1,213 114 - - $6,514
62,332
kWh
$1,213
114
kW-months/year
-
-
MMBtu
05: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$6,172
Cost:
$2,000
$4,441 42,502 $1,731 163 - - $4,441
42,502
kWh
$1,731
163
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,221
Cost:
$1,000
$5,221 49,962 - - - - $5,221
49,962
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,539
Cost:
$15,085
$6,309 60,393 $1,230 115 - - $6,309
60,393
kWh
$1,230
115
kW-months/year
-
-
MMBtu
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,590
Cost:
$20,832
$3,009 28,796 $581 55 - - $3,009
28,796
kWh
$581
55
kW-months/year
-
-
MMBtu
09: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$3,172
Cost:
$14,400
$3,136 4,801 $36 3 - - $3,136
4,801
kWh
$36
3
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$61,613
Cost:
$78,852
$39,375 351,604 $13,971 1,267 $8,267 214 $39,375
351,604
kWh
$13,971
1,267
kW-months/year
$8,267
214
MMBtu
TOTAL IMPLEMENTED Savings:
$30,850
Cost:
$18,662
$19,812 189,605 $2,771 259 $8,267 214 $19,812
189,605
kWh
$2,771
259
kW-months/year
$8,267
214
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas