Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,551
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0121 # 10 Y:1984 | 10 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $447 | $215 | Not Implemented |
KU0121 # 11 Y:1984 | 11 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $298 | $100 | Implemented |
KU0121 # 12 Y:1984 | 12 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $118 | $0 | Not Implemented |
KU0109 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $1,384 | Not Implemented |
KU0109 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $121 | $275 | Not Implemented |
KU0109 # 03 Y:1983 | 03 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $271 | $0 | Not Implemented |
KU0109 # 04 Y:1983 | 04 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $106 | $0 | Not Implemented |
KU0108 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $760 | $400 | Implemented |
KU0108 # 02 Y:1983 | 02 | 1983 | OPTIMIZE PLANT POWER FACTOR | $6,604 | $16,000 | Implemented |
KU0108 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $4,071 | $300 | Implemented |
KU0108 # 04 Y:1983 | 04 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $1,414 | $400 | Implemented |
KU0108 # 05 Y:1983 | 05 | 1983 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $872 | $132 | Implemented |
KU0108 # 06 Y:1983 | 06 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,351 | $6,314 | Implemented |
KU0108 # 07 Y:1983 | 07 | 1983 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,840 | $52 | Implemented |
KU0108 # 08 Y:1983 | 08 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $0 | Not Implemented |
KU0108 # 09 Y:1983 | 09 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $329 | $0 | Not Implemented |
UD0099 # 01 Y:1983 | 01 | 1983 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,571 | $10,000 | Not Implemented |
UD0099 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $9,454 | $4,000 | Not Implemented |
UD0099 # 03 Y:1983 | 03 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $633 | $0 | Not Implemented |
KU0095 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,354 | $2,809 | Not Implemented |
KU0095 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $1,064 | $1,400 | Not Implemented |
KU0095 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,017 | $1,230 | Not Implemented |
KU0095 # 04 Y:1983 | 04 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $878 | $4,000 | Not Implemented |
KU0095 # 05 Y:1983 | 05 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,846 | $2,000 | Not Implemented |
KU0095 # 06 Y:1983 | 06 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $1,323 | $1,400 | Not Implemented |