IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,551

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0245 # 04 Y:2020 04 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,231 $0 Implemented
IC0245 # 05 Y:2020 05 2020 UPGRADE CONTROLS ON COMPRESSORS $23,890 $13,698 Implemented
SD0599 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,200 $33,000 Not Implemented
SD0599 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,284 $8,600 Not Implemented
SD0599 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,370 $12,585 Not Implemented
SD0599 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,121 $630 Not Implemented
SD0599 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,596 $4,732 Not Implemented
TT0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $97,307 $190,198 Implemented
TT0244 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $16,484 $39,000 Not Implemented
TT0244 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $5,714 $15,000 Not Implemented
TT0244 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $4,684 $200 Implemented
TT0244 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,956 $275 Not Implemented
TT0244 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $40 Not Implemented
TT0244 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $131 $167 Not Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
UD1020 # 01 Y:2020 01 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,633 $8,000 Not Implemented
UD1020 # 02 Y:2020 02 2020 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $52,332 $47,243 Not Implemented
UD1020 # 03 Y:2020 03 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $13,712 $26,275 Not Implemented
UD1020 # 04 Y:2020 04 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,584 $27,600 Not Implemented
UD1020 # 05 Y:2020 05 2020 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,639 $6,550 Not Implemented
UD1020 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,337 $22,400 Not Implemented