IAC logo
IAC Assessment: SF0585
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0585
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2022
Principal Product Semi Conductor Photomask
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 36,000
Annual Production 18,000 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $547,815 4,867,963 kWh $0.11
Electricity Demand $268,264 7,844 kW-months/year $34.20
Electricity Fees $5,706 - $ -
Natural Gas $10,393 646 MMBtu $16.09
TOTAL ENERGY COSTS $832,178
RECOMMENDED SAVINGS* $152,636 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,279
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,341
Cost:
-
$1,341 8,332 - - - - - - $1,341
8,332
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$10,174
Cost:
$2,893
$1,477 9,175 - - $8,697 541 - - $1,477
9,175
kWh
-
-
kW-months/year
$8,697
541
MMBtu
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$23,840
Cost:
$8,000
$23,840 148,072 - - - - - - $23,840
148,072
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$897
Cost:
$400
$656 4,075 $241 6 - - - - $656
4,075
kWh
$241
6
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,867
Cost:
$8,345
$2,842 17,651 $1,025 24 - - - - $2,842
17,651
kWh
$1,025
24
kW-months/year
-
-
MMBtu
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$95,415
Cost:
$561,099
$95,415 592,641 - - - - - - $95,415
592,641
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$17,102
Cost:
$105,401
- - - - - - $17,102 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,102
-
$
TOTAL RECOMMENDED Savings:
$152,636
Cost:
$686,138
$125,571 779,946 $1,266 30 $8,697 541 $17,102 - $125,571
779,946
kWh
$1,266
30
kW-months/year
$8,697
541
MMBtu
$17,102
-
$
TOTAL IMPLEMENTED Savings:
$16,279
Cost:
$11,638
$6,316 39,233 $1,266 30 $8,697 541 - - $6,316
39,233
kWh
$1,266
30
kW-months/year
$8,697
541
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product