Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,701
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0037 # 06 Y:2024 | 06 | 2024 | RECOVER AND REUSE WASTE MATERIAL | $7,648 | $8,750 | n/a |
CI0037 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,720 | $13,500 | n/a |
CI0037 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $11,559 | $3,600 | n/a |
CI0037 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,579 | $1,600 | n/a |
CI0037 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,594 | $236,068 | n/a |
CI0037 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $74,767 | $25,940 | n/a |
MI0453 # 01 Y:2024 | 01 | 2024 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $43,981 | $80,000 | n/a |
MI0453 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $4,117 | $1,690 | n/a |
MI0453 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,976 | $11,882 | n/a |
MI0453 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,219 | $14,799 | n/a |
MI0453 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,805 | $1,620 | n/a |
GT0987 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,106 | $614,572 | n/a |
GT0987 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $339 | $875 | n/a |
GT0987 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $827 | $1,740 | n/a |
GT0987 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,073 | $800 | n/a |
GT0987 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $369 | $90 | n/a |
GT0987 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,859 | $1,800 | n/a |
GT0987 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,518 | $100 | n/a |
GT0987 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,398 | $1,850 | n/a |
SU0562 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,470 | $266,289 | n/a |
SU0562 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $639 | $2,272 | n/a |
SU0562 # 08 Y:2024 | 08 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $25,000 | $80,000 | n/a |
SU0562 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $632 | n/a |
SU0562 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $75,000 | $86,000 | n/a |
SU0562 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $374 | $418 | n/a |