Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
478
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0301 # 08 Y:2016 | 08 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $1,288 | $8,881 | Implemented |
MI0301 # 07 Y:2016 | 07 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,197 | $2,146 | Not Implemented |
MI0301 # 06 Y:2016 | 06 | 2016 | USE OPTIMUM THICKNESS INSULATION | $2,946 | $2,710 | Not Implemented |
MI0301 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,096 | $322 | Not Implemented |
MI0301 # 04 Y:2016 | 04 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,075 | $18,626 | Not Implemented |
MI0301 # 03 Y:2016 | 03 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,246 | $2,379 | Not Implemented |
MI0301 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,990 | $35,099 | Implemented |
MI0301 # 01 Y:2016 | 01 | 2016 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,850 | $1,120 | Not Implemented |
MI0298 # 12 Y:2016 | 12 | 2016 | INSTALL OCCUPANCY SENSORS | $552 | $177 | Not Implemented |
MI0298 # 11 Y:2016 | 11 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $664 | $760 | Not Implemented |
MI0298 # 10 Y:2016 | 10 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,219 | $40 | Not Implemented |
MI0298 # 09 Y:2016 | 09 | 2016 | USE PHOTOCELL CONTROLS | $2,087 | $2,520 | Not Implemented |
MI0298 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,220 | $1,660 | Implemented |
MI0298 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,682 | $5,600 | Not Implemented |
MI0298 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $8,588 | Not Implemented |
MI0298 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,324 | $3,985 | Not Implemented |
MI0298 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,528 | $40 | Not Implemented |
MI0298 # 03 Y:2016 | 03 | 2016 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $16,796 | $40,060 | Not Implemented |
MI0298 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,018 | $53,398 | Implemented |
MI0298 # 01 Y:2016 | 01 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $34,838 | $36,314 | Implemented |
MI0294 # 14 Y:2016 | 14 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $502 | $1,624 | Not Implemented |
MI0294 # 01 Y:2016 | 01 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $48,743 | $88,928 | Not Implemented |
MI0294 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,734 | $29,594 | Implemented |
MI0294 # 03 Y:2016 | 03 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,706 | $5,161 | Not Implemented |
MI0294 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,388 | $1,660 | Implemented |