Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

478

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0215 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,514 $50 Not Implemented
MI0215 # 07 Y:2012 07 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $625 $4,571 Not Implemented
UF0450 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,683 $0 Not Implemented
UF0450 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $1,378 $511 Not Implemented
UF0450 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,667 $470 Not Implemented
UF0450 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,110 $0 Not Implemented
UF0450 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $24,031 $0 Not Implemented
UF0450 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $2,246 $270 Not Implemented
UF0450 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $5,903 Not Implemented
UF0450 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,431 $0 Not Implemented
UF0450 # 09 Y:2011 09 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,074 $3,066 Not Implemented
UF0450 # 10 Y:2011 10 2011 AIR CONDITION ONLY SPACE NECESSARY $204 $17 Not Implemented
UF0450 # 11 Y:2011 11 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,406 $109 Not Implemented
MI0203 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $16,812 $34,688 Implemented
MI0203 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,265 $2,500 Implemented
MI0203 # 03 Y:2011 03 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,406 $12,400 Not Implemented
MI0203 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,489 $5,225 Implemented
MI0203 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,157 $50 Implemented
MI0203 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,006 $1,320 Implemented
UF0430 # 01 Y:2010 01 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,959 $5,655 Implemented
UF0430 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,044 $0 Implemented
UF0430 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,531 $0 Not Implemented
UF0430 # 04 Y:2010 04 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,547 $0 Implemented
UF0430 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,211 $0 Not Implemented
UF0430 # 06 Y:2010 06 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $86,549 $4,000 Not Implemented