IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0330 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $724 $1,400 Implemented
KU0330 # 03 Y:1990 03 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,198 $0 Implemented
KU0330 # 01 Y:1990 01 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,058 $490 Not Implemented
KU0330 # 02 Y:1990 02 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $5,368 $3,600 Not Implemented
KU0330 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $607 $444 Not Implemented
GT0420 # 02 Y:1990 02 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,730 $0 Implemented
GT0420 # 08 Y:1990 08 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $103,840 $250,000 Not Implemented
OK0325 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $0 Implemented
OK0325 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $333 $1,280 Not Implemented
GT0425 # 06 Y:1990 06 1990 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $110,936 $250,000 Not Implemented
GT0425 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,068 $0 Implemented
GT0425 # 03 Y:1990 03 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,080 $34,000 Implemented
GT0425 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,461 $49,722 Implemented
OK0325 # 01 Y:1990 01 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $0 Implemented
GT0425 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $568 $302 Implemented
GT0420 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $270 $990 Not Implemented
GT0420 # 05 Y:1990 05 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,150 $34,000 Implemented
GT0420 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,057 $28,321 Implemented
OK0325 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $165 $0 Implemented
GT0420 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $810 $0 Implemented
GT0420 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $377 $3,688 Implemented
OK0325 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $652 $3,027 Not Implemented
GT0420 # 01 Y:1990 01 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,248 $3,100 Implemented
GT0425 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $230 $630 Not Implemented
GT0425 # 07 Y:1990 07 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,240 $10,200 Not Implemented