IAC logo
IAC Assessment: GT0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product TELEVISION SETS
NAICS n/a
SIC 3651 - Household Audio And Video Equipment
Sales $100,000,000-$500,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 150,000 Pieces
Production Hrs. Annual 2,496
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $260,732 4,271,981 kWh $0.06
Natural Gas $9,215 1,540 MMBtu $5.98
TOTAL ENERGY COSTS $269,947
RECOMMENDED SAVINGS* $134,482 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,372
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,248
Cost:
$3,100
- - $2,248 376 - - -
-
kWh
$2,248
376
MMBtu
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,730
Cost:
-
$5,730 184,642 - - - - $5,730
184,642
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$270
Cost:
$990
$270 4,396 - - - - $270
4,396
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,057
Cost:
$28,321
$8,057 132,181 - - - - $8,057
132,181
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$13,150
Cost:
$34,000
$13,150 - - - - - $13,150
-
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$377
Cost:
$3,688
$377 6,155 - - - - $377
6,155
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$810
Cost:
-
$810 13,189 - - - - $810
13,189
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$103,840
Cost:
$250,000
$111,710 - - - $(-7,870) (-1,102) $111,710
-
kWh
-
-
MMBtu
$(-7,870)
(-1,102)
MMBtu
TOTAL RECOMMENDED Savings:
$134,482
Cost:
$320,099
$140,104 340,563 $2,248 376 $(-7,870) (-1,102) $140,104
340,563
kWh
$2,248
376
MMBtu
$(-7,870)
(-1,102)
MMBtu
TOTAL IMPLEMENTED Savings:
$30,372
Cost:
$69,109
$28,124 336,167 $2,248 376 - - $28,124
336,167
kWh
$2,248
376
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2