Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,484
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2512 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,432 | $1,275 | n/a |
LS2512 # 03 Y:2025 | 03 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,381 | $25,003 | n/a |
LS2512 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $27,997 | $144,549 | n/a |
LS2512 # 02 Y:2025 | 02 | 2025 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $16,150 | $25,000 | n/a |
LS2512 # 05 Y:2025 | 05 | 2025 | REPLACE BOILER | $31,301 | $286,589 | n/a |
DL0257 # 04 Y:2025 | 04 | 2025 | USE OPTIMUM TEMPERATURE | $1,329 | $0 | n/a |
DL0257 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,383 | $470,000 | n/a |
DL0257 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,000 | $0 | n/a |
DL0257 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $343 | $0 | n/a |
DL0257 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $291 | $131 | n/a |
TT0328 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $92,553 | $200,000 | n/a |
TT0328 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,275 | $56,250 | n/a |
TT0328 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $50 | n/a |
TT0328 # 02 Y:2025 | 02 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $184,128 | $600,000 | n/a |
TT0328 # 11 Y:2025 | 11 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,157 | $299 | n/a |
TT0328 # 05 Y:2025 | 05 | 2025 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,760 | $41,250 | n/a |
TT0328 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,721 | $631,361 | n/a |
TT0328 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $81,754 | $144,000 | n/a |
TT0328 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,908 | $60,000 | n/a |
TT0328 # 01 Y:2025 | 01 | 2025 | REDUCE OR ELIMINATE WASTE | $296,352 | $1,200,000 | n/a |
TT0328 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,990 | n/a |
TT0328 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,237 | $50 | n/a |
TT0328 # 13 Y:2025 | 13 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $306 | $50 | n/a |
AS0605 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,580 | $17,986 | n/a |
AS0605 # 01 Y:2025 | 01 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,690 | $25,500 | n/a |