IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0426 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,301 $7,526 Not Implemented
SF0426 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $373 $1,619 Not Implemented
SF0426 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $17,191 Implemented
SU0332 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $72,807 $28,851 Not Implemented
SU0332 # 02 Y:2013 02 2013 ELIMINATE/REDUCE AN OPERATION $12,570 $7,200 Not Implemented
SU0332 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,121 $10,392 Not Implemented
SU0332 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,766 $1,320 Implemented
SU0332 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $1,180 $5,512 Not Implemented
SU0332 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,516 $37,508 Not Implemented
BD0421 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,364 $30,195 Implemented
BD0421 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,995 $1,140 Not Implemented
BD0421 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,571 $15,000 Implemented
BD0421 # 04 Y:2013 04 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,147 $1,500 Not Implemented
BD0421 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,067 $1,425 Implemented
BD0421 # 06 Y:2013 06 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,564 $40 Not Implemented
BD0421 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,968 $1,500 Implemented
BD0421 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,219 $2,000 Not Implemented
BD0421 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $700 Implemented
BD0421 # 10 Y:2013 10 2013 MINIMIZE WATER USAGE $4,683 $4,200 Implemented
IP0007 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,164 $0 Implemented
IP0007 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,744 $0 Implemented
IP0007 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $13,528 $33,600 Not Implemented
IP0007 # 04 Y:2013 04 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $46,311 $151,951 Not Implemented
UA3025 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,774 $8,081 Implemented
UA3025 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,515 $2,400 Not Implemented