IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 361 Electric Distribution Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0020 # 11 Y:2023 11 2023 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,050 n/a
CC0020 # 10 Y:2023 10 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,194 $0 n/a
CC0020 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,381 $0 n/a
CC0020 # 08 Y:2023 08 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,389 $200,000 n/a
CC0020 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $23,819 $15,000 n/a
CC0020 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,812 $19,750 n/a
CC0020 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $418 n/a
CC0020 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $54,767 $200,000 n/a
CC0020 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,379 $0 n/a
CC0020 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,402 $3,033 n/a
CC0020 # 02 Y:2023 02 2023 INSULATE FEEDWATER TANK $905 $1,622 n/a
CC0020 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $4,526 $0 n/a
NC0418 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $133 $567 Not Implemented
NC0418 # 07 Y:2011 07 2011 ADOPT IN-HOUSE MATERIAL GENERATION $5,969 $25,000 Not Implemented
NC0418 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,663 $100 Implemented
NC0418 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $202 $600 Not Implemented
NC0418 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,540 $37,837 Not Implemented
NC0418 # 02 Y:2011 02 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,535 $5,000 Implemented
NC0418 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $244,640 $566,702 Not Implemented
NC0385 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $0 Implemented
NC0385 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,357 $500 Implemented
NC0385 # 01 Y:2009 01 2009 COMBINE UTILITY METERS $2,054 $0 Not Implemented
NC0385 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,705 $1,900 Not Implemented
NC0385 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $1,643 Implemented
NC0385 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $9,880 Implemented