Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 361 | Electric Distribution Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0020 # 11 Y:2023 | 11 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $4,104 | $6,050 | n/a |
CC0020 # 10 Y:2023 | 10 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,194 | $0 | n/a |
CC0020 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,381 | $0 | n/a |
CC0020 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $17,389 | $200,000 | n/a |
CC0020 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,819 | $15,000 | n/a |
CC0020 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,812 | $19,750 | n/a |
CC0020 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $418 | n/a |
CC0020 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $54,767 | $200,000 | n/a |
CC0020 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,379 | $0 | n/a |
CC0020 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,402 | $3,033 | n/a |
CC0020 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $905 | $1,622 | n/a |
CC0020 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $4,526 | $0 | n/a |
NC0418 # 06 Y:2011 | 06 | 2011 | INSULATE BARE EQUIPMENT | $133 | $567 | Not Implemented |
NC0418 # 07 Y:2011 | 07 | 2011 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,969 | $25,000 | Not Implemented |
NC0418 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,663 | $100 | Implemented |
NC0418 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $202 | $600 | Not Implemented |
NC0418 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,540 | $37,837 | Not Implemented |
NC0418 # 02 Y:2011 | 02 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $30,535 | $5,000 | Implemented |
NC0418 # 01 Y:2011 | 01 | 2011 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $244,640 | $566,702 | Not Implemented |
NC0385 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $210 | $0 | Implemented |
NC0385 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,357 | $500 | Implemented |
NC0385 # 01 Y:2009 | 01 | 2009 | COMBINE UTILITY METERS | $2,054 | $0 | Not Implemented |
NC0385 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,705 | $1,900 | Not Implemented |
NC0385 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $872 | $1,643 | Implemented |
NC0385 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,555 | $9,880 | Implemented |