Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2011 |
Principal Product | Medium voltage transformers |
NAICS | 335311 - Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612 - Transformers, Except Electronic |
Sales | $50,000,000-$100,000,000 |
# of Employees | 225 |
Plant Area (Sq.Ft.) | 162,000 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $516,716 | 7,191,600 | kWh | $0.07 |
Electricity Demand | $355,867 | 16,399 | kW-months/year | $21.70 |
TOTAL ENERGY COSTS | $872,583 | |||
RECOMMENDED SAVINGS* | $304,682 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,198 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $244,640 Cost: $566,702 |
$3,443 | 47,780 | $284,134 | 11,955 | $(-42,937) | (-3,461) | - | - | - | - | - | - |
$3,443 47,780 kWh |
$284,134 11,955 kW-months/year |
$(-42,937) (-3,461) MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $30,535 Cost: $5,000 |
- | - | $31,135 | 1,300 | - | - | $(-600) | - | - | - | - | - |
- - kWh |
$31,135 1,300 kW-months/year |
- - MMBtu |
$(-600) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,540 Cost: $37,837 |
$9,587 | 133,424 | $10,853 | 400 | - | - | - | - | $100 | - | - | - |
$9,587 133,424 kWh |
$10,853 400 kW-months/year |
- - MMBtu |
- - $ |
$100 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $202 Cost: $600 |
$202 | 2,816 | - | - | - | - | - | - | - | - | - | - |
$202 2,816 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,663 Cost: $100 |
$1,681 | 23,400 | $1,822 | 67 | - | - | $(-600) | - | - | - | $(-240) | - |
$1,681 23,400 kWh |
$1,822 67 kW-months/year |
- - MMBtu |
$(-600) - $ |
- - $ |
$(-240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $133 Cost: $567 |
$133 | 1,852 | - | - | - | - | - | - | - | - | - | - |
$133 1,852 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $5,969 Cost: $25,000 |
$(-2,694) | (-37,495) | $(-3,059) | (-113) | - | - | - | - | $(-1,200) | - | $12,922 | - |
$(-2,694) (-37,495) kWh |
$(-3,059) (-113) kW-months/year |
- - MMBtu |
- - $ |
$(-1,200) - $ |
$12,922 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $304,682 Cost: $635,806 |
$12,352 | 171,777 | $324,885 | 13,609 | $(-42,937) | (-3,461) | $(-1,200) | - | $(-1,100) | - | $12,682 | - | $12,352 171,777 kWh |
$324,885 13,609 kW-months/year |
$(-42,937) (-3,461) MMBtu |
$(-1,200) - $ |
$(-1,100) - $ |
$12,682 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,198 Cost: $5,100 |
$1,681 | 23,400 | $32,957 | 1,367 | - | - | $(-1,200) | - | - | - | $(-240) | - | $1,681 23,400 kWh |
$32,957 1,367 kW-months/year |
- - MMBtu |
$(-1,200) - $ |
- - $ |
$(-240) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #2 | Personnel Changes | Administrative Changes | Ancillary Material Cost |