IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

386

matching recommendations
Reset
SIC 3613 Switchgear And Switchboard Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0002 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,186 $100 Implemented
MO0002 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $2,183 $5,826 Not Implemented
MO0002 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,165 $150 Implemented
MO0002 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $930 Not Implemented
OK0260 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $604 $0 Not Implemented
OK0260 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,473 $525 Not Implemented
OK0260 # 04 Y:1988 04 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,831 $275 Not Implemented
OK0260 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,927 $1,500 Not Implemented
OK0260 # 06 Y:1988 06 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,063 $8,400 Not Implemented
OK0260 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $822 $740 Not Implemented
OK0260 # 08 Y:1988 08 1988 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,618 $1,200 Not Implemented
TN0329 # 01 Y:1988 01 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,964 $19,684 Not Implemented
TN0329 # 02 Y:1988 02 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,471 $2,193 Implemented
TN0329 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,753 $615 Implemented
TN0329 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,619 $0 Implemented
TN0329 # 05 Y:1988 05 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,783 $3,300 Implemented
TN0329 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,824 $1,180 Implemented
TN0329 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $1,824 $0 Implemented
TN0329 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $1,151 $566 Not Implemented
TN0329 # 09 Y:1988 09 1988 INSULATE BARE EQUIPMENT $1,106 $146 Implemented
TN0329 # 10 Y:1988 10 1988 COVER OPEN TANKS $252 $0 Implemented
TN0329 # 11 Y:1988 11 1988 INSULATE BARE EQUIPMENT $196 $561 Not Implemented
TN0329 # 12 Y:1988 12 1988 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $179 $600 Implemented
OK0236 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $238 Implemented
OK0236 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $353 $734 Implemented