Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0252 # 02 Y:2018 | 02 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,478 | $32,500 | Implemented |
MZ0252 # 05 Y:2018 | 05 | 2018 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $65,281 | $50,000 | Implemented |
MZ0252 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $656 | $4,200 | Not Implemented |
MZ0252 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $516 | $50 | Implemented |
MZ0252 # 01 Y:2018 | 01 | 2018 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,011 | $540 | Implemented |
MZ0252 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,159 | $0 | Implemented |
MZ0162 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $657 | $0 | Not Implemented |
MZ0162 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,303 | $2,900 | Not Implemented |
MZ0162 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,287 | $16,804 | Implemented |
MZ0162 # 03 Y:2014 | 03 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $537 | $2,680 | Implemented |
MZ0162 # 05 Y:2014 | 05 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $560 | $2,906 | Not Implemented |
MZ0157 # 01 Y:2014 | 01 | 2014 | INSULATE BARE EQUIPMENT | $571 | $601 | Not Implemented |
MZ0157 # 04 Y:2014 | 04 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,223 | $17,400 | Not Implemented |
MZ0157 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,149 | $30,133 | Implemented |
MZ0157 # 02 Y:2014 | 02 | 2014 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,077 | $10,750 | Implemented |
MZ0157 # 05 Y:2014 | 05 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,840 | $9,600 | Implemented |
MZ0130 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $49,337 | $60,000 | Not Implemented |
MZ0130 # 03 Y:2013 | 03 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $17,041 | $5,200 | Implemented |
MZ0130 # 02 Y:2013 | 02 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $5,800 | Not Implemented |
MZ0130 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,911 | $36,015 | Implemented |
MZ0130 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,164 | $1,000 | Implemented |
MZ0130 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,741 | $0 | Not Implemented |
MO0231 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $207 | Not Implemented |
MO0231 # 08 Y:1998 | 08 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $990 | $1,872 | Implemented |
MO0231 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,184 | $80 | Not Implemented |