IAC Assessment: MZ0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2014
Principal Product switchgears and electric relay panels
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 119,600
Annual Production 110 Pieces
Production Hrs. Annual 4,500
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,112 2,535,800 kWh $0.06
Electricity Demand $18,646 7,924 kW-months/year $2.35
LPG $80,400 5,496 MMBtu $14.63
TOTAL ENERGY COSTS $257,158
RECOMMENDED SAVINGS* $5,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,824
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,303
Cost:
$2,900
- - - - $1,303 89 -
-
kWh
-
-
kW-months/year
$1,303
89
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$657
Cost:
-
$657 10,603 - - - - $657
10,603
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$537
Cost:
$2,680
$537 8,656 - - - - $537
8,656
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,287
Cost:
$16,804
$1,884 30,388 $403 139 - - $1,884
30,388
kWh
$403
139
kW-months/year
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$560
Cost:
$2,906
$509 8,204 $51 22 - - $509
8,204
kWh
$51
22
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,344
Cost:
$25,290
$3,587 57,851 $454 161 $1,303 89 $3,587
57,851
kWh
$454
161
kW-months/year
$1,303
89
MMBtu
TOTAL IMPLEMENTED Savings:
$2,824
Cost:
$19,484
$2,421 39,044 $403 139 - - $2,421
39,044
kWh
$403
139
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG