IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1025 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $8,651 Implemented
OK1025 # 04 Y:2020 04 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,427 $1,500 Implemented
OK1025 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $5,805 $65 Implemented
OK1025 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,684 $2,420 Implemented
OK1025 # 01 Y:2020 01 2020 USE RADIANT HEATER FOR SPOT HEATING $34,672 $127,500 Implemented
OK0879 # 10 Y:2014 10 2014 INSULATE BARE EQUIPMENT $304 $148 Implemented
OK0879 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $402 $237 Implemented
OK0879 # 06 Y:2014 06 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,374 $29,700 Implemented
OK0879 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,649 $1,014 Implemented
OK0879 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,769 $168 Implemented
OK0879 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,423 $7,826 Implemented
OK0879 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,268 $1,245 Implemented
OK0865 # 02 Y:2013 02 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $47,613 $33,780 Implemented
OK0865 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,177 $462 Implemented
OK0865 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,472 $1,050 Implemented
OK0865 # 03 Y:2013 03 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $5,494 $1,776 Implemented
OK0865 # 01 Y:2013 01 2013 INSTALL SET-BACK TIMERS $2,575 $1,530 Implemented
OK0452 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $790 $1,351 Implemented
OK0452 # 02 Y:1994 02 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,302 $0 Implemented
OK0452 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,658 $12,000 Implemented
OK0424 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,472 $150 Implemented
OK0424 # 05 Y:1994 05 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,040 $2,250 Implemented
OK0424 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,534 $3,000 Implemented
OK0424 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,237 $10,548 Implemented
OK0424 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,495 $12,752 Implemented