IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

580

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0446 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $191 Implemented
KU0446 # 10 Y:1994 10 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $504 $10 Implemented
KU0446 # 11 Y:1994 11 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,584 $12,960 Implemented
KU0446 # 12 Y:1994 12 1994 INSTALL SKYLIGHTS $3,223 $4,920 Implemented
KU0446 # 13 Y:1994 13 1994 INSTALL OCCUPANCY SENSORS $1,170 $1,540 Implemented
KU0446 # 14 Y:1994 14 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $540 Implemented
DS0012 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,963 $38,850 Implemented
DS0012 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,546 $14,287 Implemented
DS0012 # 03 Y:1994 03 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,302 $1,499 Implemented
DS0012 # 04 Y:1994 04 1994 USE RADIANT HEATER FOR SPOT HEATING $19,328 $51,600 Not Implemented
OK0452 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,658 $12,000 Implemented
OK0452 # 02 Y:1994 02 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,302 $0 Implemented
OK0452 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $790 $1,351 Implemented
OK0452 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $128 $237 Not Implemented
AR0038 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,079 $300 Implemented
AR0038 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,118 $200 Implemented
AR0038 # 03 Y:1994 03 1994 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $4,094 $2,000 Implemented
AR0038 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,584 $220 Implemented
AR0038 # 05 Y:1994 05 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $20,991 $30,000 Not Implemented
NC0028 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $153 $250 Implemented
NC0028 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $600 Implemented
NC0028 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $787 $240 Not Implemented
NC0028 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $736 $1,510 Implemented
NC0028 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,525 $7,000 Not Implemented
OK0424 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,495 $12,752 Implemented