IAC Assessment: KU0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1994
Principal Product diesel generators
NAICS n/a
SIC 3621 - Motors And Generators
Sales $5,000,000-$10,000,000
# of Employees 430
Plant Area (Sq.Ft.) 160,125
Annual Production 5,500 Pieces
Production Hrs. Annual 2,340
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,404 2,418,816 kWh $0.07
Natural Gas $58,833 11,410 MMBtu $5.16
TOTAL ENERGY COSTS $228,237
RECOMMENDED SAVINGS* $81,354 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,124
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$38,324
Cost:
$12,000
$6,734 96,131 - - $31,590 - $6,734
96,131
kWh
-
-
MMBtu
$31,590
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,466
Cost:
$2,616
$26,216 374,267 $(-7,750) (-1,502) - - $26,216
374,267
kWh
$(-7,750)
(-1,502)
MMBtu
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,601
Cost:
$1,600
$1,601 22,860 - - - - $1,601
22,860
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,291
Cost:
$300
$4,291 61,254 - - - - $4,291
61,254
kWh
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,038
Cost:
$10
$3,038 43,376 - - - - $3,038
43,376
kWh
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,279
Cost:
$240
$2,279 32,532 - - - - $2,279
32,532
kWh
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$801
Cost:
$150
$801 11,430 - - - - $801
11,430
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$965
Cost:
$1,197
$965 13,775 - - - - $965
13,775
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$698
Cost:
$191
$698 9,965 - - - - $698
9,965
kWh
-
-
MMBtu
-
-
$
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$504
Cost:
$10
$287 4,103 $217 42 - - $287
4,103
kWh
$217
42
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,584
Cost:
$12,960
$5,584 58,617 - - - - $5,584
58,617
kWh
-
-
MMBtu
-
-
$
12: 2.7145 INSTALL SKYLIGHTS Savings:
$3,223
Cost:
$4,920
$3,223 46,014 - - - - $3,223
46,014
kWh
-
-
MMBtu
-
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,170
Cost:
$1,540
$1,170 16,706 - - - - $1,170
16,706
kWh
-
-
MMBtu
-
-
$
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$410
Cost:
$540
$410 2,931 - - - - $410
2,931
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$81,354
Cost:
$38,274
$57,297 793,961 $(-7,533) (-1,460) $31,590 - $57,297
793,961
kWh
$(-7,533)
(-1,460)
MMBtu
$31,590
-
$
TOTAL IMPLEMENTED Savings:
$19,124
Cost:
$21,898
$18,907 245,897 $217 42 - - $18,907
245,897
kWh
$217
42
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost