IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 3621 Motors And Generators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0578 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $325 $2,165 n/a
OK0578 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $110 n/a
OK0578 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,087 $500 n/a
OK0452 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $128 $237 Not Implemented
OK0452 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,658 $12,000 Implemented
OK0452 # 02 Y:1994 02 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,302 $0 Implemented
OK0452 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $790 $1,351 Implemented
OK0424 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $0 Not Implemented
OK0424 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,472 $150 Implemented
OK0424 # 05 Y:1994 05 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,040 $2,250 Implemented
OK0424 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,414 $6,750 Not Implemented
OK0424 # 03 Y:1994 03 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,534 $3,000 Implemented
OK0424 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,237 $10,548 Implemented
OK0424 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,495 $12,752 Implemented
OK0268 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $952 $449 Not Implemented
OK0268 # 08 Y:1988 08 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,742 $275 Implemented
OK0268 # 07 Y:1988 07 1988 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $320 $637 Implemented
OK0268 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $2,083 $1,185 Implemented
OK0268 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,350 $2,030 Implemented
OK0268 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $636 Not Implemented
OK0268 # 03 Y:1988 03 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,336 $0 Implemented
OK0268 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,034 $520 Implemented