Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 3621 | Motors And Generators |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0354 # 11 Y:1999 | 11 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $360 | $800 | Implemented |
WI0354 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $373 | $640 | Implemented |
WI0354 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $477 | $180 | Implemented |
WI0354 # 08 Y:1999 | 08 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,284 | $5,000 | Implemented |
WI0354 # 07 Y:1999 | 07 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $1,418 | $4,850 | Not Implemented |
WI0354 # 06 Y:1999 | 06 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $2,328 | $400 | Implemented |
WI0354 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,618 | $500 | Not Implemented |
WI0354 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,567 | $18,988 | Implemented |
WI0354 # 03 Y:1999 | 03 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,465 | $0 | Implemented |
WI0354 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,469 | $500 | Implemented |
WI0354 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $7,740 | $21,000 | Not Implemented |
MO0251 # 02 Y:1999 | 02 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $900 | $1,831 | Implemented |
MO0251 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $15,502 | $17,960 | Implemented |
MO0251 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,713 | $3,862 | Implemented |
MO0251 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $910 | $100 | Implemented |
MO0251 # 03 Y:1999 | 03 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $27,239 | $13,276 | Implemented |
MO0251 # 01 Y:1999 | 01 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $1,228 | $3,360 | Not Implemented |
WI0316 # 06 Y:1998 | 06 | 1998 | TREAT AND REUSE RINSE WATERS | $931 | $1,475 | Not Implemented |
WI0316 # 05 Y:1998 | 05 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,025 | $10,000 | Not Implemented |
WI0316 # 04 Y:1998 | 04 | 1998 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $6,566 | $0 | Implemented |
WI0316 # 03 Y:1998 | 03 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,476 | $30,250 | Not Implemented |
WI0316 # 02 Y:1998 | 02 | 1998 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $15,330 | $46,000 | Not Implemented |
WI0316 # 01 Y:1998 | 01 | 1998 | ELIMINATE SHIFT | $36,000 | $40,000 | Not Implemented |