IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
SIC 3624 Carbon And Graphite Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0242 # 02 Y:2024 02 2024 CLOSE OFF UNNEEDED STEAM LINES $10,220 $4,400 Not Implemented
UU0242 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,520 $9,510 Implemented
UU0242 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,164 $37,300 Implemented
UU0242 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $5,187 $5,143 Implemented
UU0242 # 05 Y:2024 05 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,004 $11,422 Not Implemented
UU0242 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,658 $13,800 Implemented
UU0242 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $139,774 $4,000 Implemented
UU0242 # 09 Y:2024 09 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,487 $68,600 Not Implemented
UU0242 # 10 Y:2024 10 2024 UPGRADE OBSOLETE EQUIPMENT $12,250 $84,300 Implemented
NT0019 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $12,574 $0 Not Implemented
NT0019 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,036 $9,814 Not Implemented
NT0019 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,486 $33,471 Not Implemented
NT0019 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $60,556 $294,320 Not Implemented
NT0019 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,487 $4,553 Not Implemented
SU0508 # 05 Y:2021 05 2021 ELIMINATE/REDUCE AN OPERATION $4,431 $5,566 Not Implemented
SU0508 # 11 Y:2021 11 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $291 $1,055 Not Implemented
SU0508 # 10 Y:2021 10 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $158 $393 Not Implemented
SU0508 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,796 $35,087 Not Implemented
SU0508 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $3,900 $5,861 Not Implemented
SU0508 # 04 Y:2021 04 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $202 $107 Not Implemented
SU0508 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $1,160 Not Implemented
SU0508 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $2,405 $499 Not Implemented
SU0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $33 $0 Not Implemented
SU0508 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $775 $81 Not Implemented
SU0508 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,878 $15,784 Not Implemented