IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 3625 Relays And Industrial Controls
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0418 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $729 $1,308 Not Implemented
SU0418 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $336 $333 Implemented
SU0418 # 03 Y:2016 03 2016 DISCONNECT BALLASTS $870 $0 Not Implemented
SU0418 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $641 $0 Implemented
SU0418 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $722 $0 Not Implemented
SU0390 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $15,369 Not Implemented
SU0390 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,011 $1,637 Not Implemented
SU0390 # 10 Y:2015 10 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $81 $357 Not Implemented
SU0390 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,765 $68,288 Not Implemented
SU0390 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,177 $440 Not Implemented
SU0390 # 07 Y:2015 07 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24 $73 Not Implemented
SU0390 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $478 $586 Not Implemented
SU0390 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,464 $1,320 Not Implemented
SU0390 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,702 $1,033 Implemented
SU0390 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $355 $0 Implemented
SU0131 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $997 $102 Implemented
SU0131 # 01 Y:2002 01 2002 CHANGE PRODUCT SPECS $14,930 $2,500 Not Implemented
SU0131 # 02 Y:2002 02 2002 ELIMINATE/REDUCE AN OPERATION $2,391 $115 Not Implemented
SU0131 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $775 $193 Implemented
SU0131 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $197 $0 Not Implemented
SU0131 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $917 $115 Not Implemented
SU0127 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $416 Not Implemented
SU0127 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $781 $125 Not Implemented
SU0127 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $574 $3,275 Not Implemented
SU0127 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $45 $158 Not Implemented