Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3629 | Electrical Industrial Apparatus, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0157 # 05 Y:2014 | 05 | 2014 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,840 | $9,600 | Implemented |
MZ0157 # 04 Y:2014 | 04 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,223 | $17,400 | Not Implemented |
MZ0157 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,149 | $30,133 | Implemented |
MZ0157 # 02 Y:2014 | 02 | 2014 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $1,077 | $10,750 | Implemented |
MZ0157 # 01 Y:2014 | 01 | 2014 | INSULATE BARE EQUIPMENT | $571 | $601 | Not Implemented |
MZ0130 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,741 | $0 | Not Implemented |
MZ0130 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $49,337 | $60,000 | Not Implemented |
MZ0130 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,911 | $36,015 | Implemented |
MZ0130 # 03 Y:2013 | 03 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $17,041 | $5,200 | Implemented |
MZ0130 # 02 Y:2013 | 02 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $5,800 | Not Implemented |
MZ0130 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,164 | $1,000 | Implemented |
MO0231 # 06 Y:1998 | 06 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,184 | $80 | Not Implemented |
MO0231 # 10 Y:1998 | 10 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,947 | $5,800 | Implemented |
MO0231 # 09 Y:1998 | 09 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $205 | $0 | Implemented |
MO0231 # 08 Y:1998 | 08 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $990 | $1,872 | Implemented |
MO0231 # 07 Y:1998 | 07 | 1998 | USE SYNTHETIC LUBRICANT | $261 | $178 | Not Implemented |
MO0231 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $466 | $90 | Not Implemented |
MO0231 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $127 | $207 | Not Implemented |
MO0231 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $631 | $898 | Not Implemented |
MO0231 # 02 Y:1998 | 02 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $7,800 | $3,800 | Not Implemented |
MO0231 # 01 Y:1998 | 01 | 1998 | EXPAND OPERATIONS INTO UNUSED SPACE | $26,666 | $55,772 | Not Implemented |
MO0110 # 01 Y:1994 | 01 | 1994 | USE RADIANT HEATER FOR SPOT HEATING | $13,598 | $32,200 | Not Implemented |
MO0110 # 10 Y:1994 | 10 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $987 | $1,093 | Implemented |
MO0110 # 09 Y:1994 | 09 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,424 | $40 | Implemented |
MO0110 # 08 Y:1994 | 08 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,310 | $1,806 | Not Implemented |