Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
403
matching recommendationsSIC | 363 | Household Appliances |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0190 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $249 | $50 | Implemented |
KU0190 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |
TN0264 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $7,624 | $1,400 | Not Implemented |
TN0264 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,827 | $4,000 | Not Implemented |
TN0264 # 03 Y:1985 | 03 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,044 | $13,200 | Not Implemented |
TN0264 # 04 Y:1985 | 04 | 1985 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $5,480 | $12,000 | Not Implemented |
ST0022 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,958 | $3,117 | Not Implemented |
ST0022 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,376 | $160 | Implemented |
ST0022 # 03 Y:1985 | 03 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,760 | $420 | Implemented |
ST0022 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,743 | $1,900 | Not Implemented |
ST0022 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $148 | $0 | Implemented |
ST0022 # 06 Y:1985 | 06 | 1985 | REDUCE GLAZED AREAS IN BUILDINGS | $186 | $91 | Implemented |
ST0022 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $256 | $85 | Implemented |
ST0022 # 08 Y:1985 | 08 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,502 | $1,000 | Not Implemented |
ST0022 # 09 Y:1985 | 09 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,480 | $1,246 | Implemented |
ST0022 # 10 Y:1985 | 10 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,680 | $5,600 | Not Implemented |
ST0022 # 11 Y:1985 | 11 | 1985 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $767 | $5 | Implemented |
LT0017 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,540 | $150 | Implemented |
LT0017 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $13,000 | Implemented |
LT0017 # 05 Y:1985 | 05 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $569 | $600 | Not Implemented |
LT0017 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,190 | $10,000 | Implemented |
MA0019 # 01 Y:1985 | 01 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,633 | $900 | Implemented |
MA0019 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,403 | $800 | Implemented |
MA0019 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $380 | $153 | Not Implemented |
MA0019 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $39 | $98 | Not Implemented |