Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | ELECTRIC APPLIANCES |
NAICS | n/a |
SIC | 3634 - Electric Housewares And Fans |
Sales | $5,000,000-$10,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 300,000 Pieces |
Production Hrs. Annual | 2,780 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,276 | 514,947 | kWh | $0.11 |
Natural Gas | $4,031 | 587 | MMBtu | $6.87 |
Fuel Oil #4 | $16,974 | 2,592 | MMBtu | $6.55 |
TOTAL ENERGY COSTS | $77,281 | |||
RECOMMENDED SAVINGS* | $26,856 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,973 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,958 Cost: $3,117 |
- | - | - | - | $1,958 | 305 |
- - kWh |
- - MMBtu |
$1,958 305 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,376 Cost: $160 |
$5,376 | 49,238 | - | - | - | - |
$5,376 49,238 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,760 Cost: $420 |
- | - | - | - | $3,760 | 587 |
- - kWh |
- - MMBtu |
$3,760 587 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $4,743 Cost: $1,900 |
$4,743 | - | - | - | - | - |
$4,743 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $148 Cost: - |
- | - | $148 | 22 | - | - |
- - kWh |
$148 22 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS |
Savings: $186 Cost: $91 |
- | - | - | - | $186 | 29 |
- - kWh |
- - MMBtu |
$186 29 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $256 Cost: $85 |
$256 | 2,345 | - | - | - | - |
$256 2,345 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,502 Cost: $1,000 |
- | - | - | - | $1,502 | 234 |
- - kWh |
- - MMBtu |
$1,502 234 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,480 Cost: $1,246 |
$4,480 | 41,032 | - | - | - | - |
$4,480 41,032 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $3,680 Cost: $5,600 |
$3,680 | 33,705 | - | - | - | - |
$3,680 33,705 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $767 Cost: $5 |
- | - | $767 | 114 | - | - |
- - kWh |
$767 114 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,856 Cost: $13,624 |
$18,535 | 126,320 | $915 | 136 | $7,406 | 1,155 | $18,535 126,320 kWh |
$915 136 MMBtu |
$7,406 1,155 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,973 Cost: $2,007 |
$10,112 | 92,615 | $915 | 136 | $3,946 | 616 | $10,112 92,615 kWh |
$915 136 MMBtu |
$3,946 616 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #4 | Electricity Usage | Natural Gas | Fuel Oil #4 |