Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 363 | Household Appliances |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0264 # 04 Y:1985 | 04 | 1985 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $5,480 | $12,000 | Not Implemented |
TN0264 # 03 Y:1985 | 03 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,044 | $13,200 | Not Implemented |
TN0264 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,827 | $4,000 | Not Implemented |
TN0264 # 01 Y:1985 | 01 | 1985 | INSULATE BARE EQUIPMENT | $7,624 | $1,400 | Not Implemented |
ST0022 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,743 | $1,900 | Not Implemented |
ST0022 # 11 Y:1985 | 11 | 1985 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $767 | $5 | Implemented |
ST0022 # 10 Y:1985 | 10 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,680 | $5,600 | Not Implemented |
ST0022 # 09 Y:1985 | 09 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,480 | $1,246 | Implemented |
ST0022 # 08 Y:1985 | 08 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,502 | $1,000 | Not Implemented |
ST0022 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $256 | $85 | Implemented |
ST0022 # 06 Y:1985 | 06 | 1985 | REDUCE GLAZED AREAS IN BUILDINGS | $186 | $91 | Implemented |
ST0022 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $148 | $0 | Implemented |
ST0022 # 03 Y:1985 | 03 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,760 | $420 | Implemented |
ST0022 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,376 | $160 | Implemented |
ST0022 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,958 | $3,117 | Not Implemented |
LT0017 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,540 | $150 | Implemented |
MA0019 # 05 Y:1985 | 05 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,127 | $4,000 | Not Implemented |
MA0019 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $39 | $98 | Not Implemented |
MA0019 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $380 | $153 | Not Implemented |
MA0019 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,403 | $800 | Implemented |
MA0019 # 01 Y:1985 | 01 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,633 | $900 | Implemented |
LT0017 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,190 | $10,000 | Implemented |
LT0017 # 05 Y:1985 | 05 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $569 | $600 | Not Implemented |
LT0017 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,960 | $13,000 | Implemented |