IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 3631 Household Cooking Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0261 # 02 Y:2025 02 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,374 $0 n/a
DL0261 # 03 Y:2025 03 2025 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,021 $7,950 n/a
DL0261 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,337 $90,000 n/a
DL0261 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,186 $16,400 n/a
DL0261 # 06 Y:2025 06 2025 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,283 $1,200 n/a
DL0261 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $5,489 $720 n/a
TN0643 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $219,500 $24,000 Implemented
TN0643 # 05 Y:1998 05 1998 OPERATE BOILERS ON HIGH FIRE SETTING $10,600 $0 Implemented
TN0643 # 04 Y:1998 04 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $12,000 $0 Implemented
TN0643 # 02 Y:1998 02 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $90,000 $30,000 Not Implemented
TN0643 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,200 $0 Implemented
TN0643 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $19,290 $4,800 Implemented
TN0617 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $5,800 $4,500 n/a
TN0617 # 05 Y:1997 05 1997 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,475 $810 n/a
TN0617 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,350 $4,050 n/a
TN0617 # 02 Y:1997 02 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $22,800 $16,000 n/a
TN0617 # 01 Y:1997 01 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $24,900 $21,000 n/a
TN0595 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $9,770 $5,400 Implemented
TN0595 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,660 $480 Not Implemented
TN0595 # 02 Y:1996 02 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $33,550 $15,600 Not Implemented
TN0595 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $34,060 $12,880 Implemented
TN0595 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,230 $7,525 Implemented
TN0595 # 07 Y:1996 07 1996 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $2,600 $0 Implemented
TN0595 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,920 $4,450 Not Implemented
TN0595 # 08 Y:1996 08 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,600 $930 Not Implemented