Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3634 | Electric Housewares And Fans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0257 # 07 Y:1999 | 07 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,004 | $0 | Implemented |
MO0257 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,342 | $0 | Implemented |
MO0257 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,596 | $0 | Implemented |
MO0257 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,831 | $0 | Implemented |
MO0088 # 09 Y:1993 | 09 | 1993 | PAY UTILITY BILLS ON TIME | $985 | $0 | Implemented |
MO0088 # 01 Y:1993 | 01 | 1993 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,701 | $8,000 | Implemented |
MO0021 # 02 Y:1991 | 02 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $1,316 | Implemented |
MO0021 # 08 Y:1991 | 08 | 1991 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $289 | $700 | Implemented |
MO0021 # 07 Y:1991 | 07 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,114 | $435 | Implemented |
MO0021 # 06 Y:1991 | 06 | 1991 | INSULATE BARE EQUIPMENT | $1,577 | $4,250 | Implemented |
MO0021 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $961 | $0 | Implemented |
MO0021 # 04 Y:1991 | 04 | 1991 | INSULATE BARE EQUIPMENT | $3,394 | $6,952 | Implemented |
MO0021 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,061 | $5,968 | Implemented |
MO0021 # 01 Y:1991 | 01 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,969 | $1,195 | Implemented |
MO0018 # 05 Y:1991 | 05 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $469 | $700 | Implemented |
MO0018 # 04 Y:1991 | 04 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,232 | $315 | Implemented |
MO0018 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $426 | $757 | Implemented |
MO0018 # 02 Y:1991 | 02 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,564 | $1,000 | Implemented |
MO0018 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,073 | $542 | Implemented |
KU0190 # 01 Y:1986 | 01 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,383 | $50 | Implemented |
KU0190 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |
KU0190 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $249 | $50 | Implemented |
KU0190 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $673 | $10 | Implemented |
KU0190 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $658 | $120 | Implemented |
KU0190 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $1,510 | Implemented |