IAC logo
IAC Assessment: MO0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Electric Household Appliances
NAICS n/a
SIC 3634 - Electric Housewares And Fans
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 225,000
Annual Production 5,200,000 Pieces
Production Hrs. Annual 2,450
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,777 3,358,441 kWh $0.05
Electricity Demand $25,547 1,101 kW-months/year $23.20
Electricity Fees $21,720 - $ -
Natural Gas $129,505 37,522 MMBtu $3.45
TOTAL ENERGY COSTS $415,122
RECOMMENDED SAVINGS* $79,773 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,831
Cost:
-
$5,787 110,785 $1,044 45 - - - - $5,787
110,785
kWh
$1,044
45
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,596
Cost:
-
$1,271 24,326 $325 14 - - - - $1,271
24,326
kWh
$325
14
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,342
Cost:
-
$1,715 32,825 $627 27 - - - - $1,715
32,825
kWh
$627
27
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$990
Cost:
-
$735 14,068 $255 11 - - - - $735
14,068
kWh
$255
11
kW-months/year
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$27,000
Cost:
-
- - - - $27,000 600 - - -
-
kWh
-
-
kW-months/year
$27,000
600
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$18,130
Cost:
-
- - - - $18,130 12,250 - - -
-
kWh
-
-
kW-months/year
$18,130
12,250
lb
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,004
Cost:
-
- - - - - - $11,004 - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,004
-
$
08: 4.422 UTILIZE OUTSIDE CONTRACTING Savings:
$11,880
Cost:
-
- - - - - - $11,880 - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,880
-
$
TOTAL RECOMMENDED Savings:
$79,773
Cost:
-
$9,508 182,004 $2,251 97 $45,130 12,850 $22,884 - $9,508
182,004
kWh
$2,251
97
kW-months/year
$45,130
12,850
lb
$22,884
-
$
TOTAL IMPLEMENTED Savings:
$21,773
Cost:
-
$8,773 167,936 $1,996 86 - - $11,004 - $8,773
167,936
kWh
$1,996
86
kW-months/year
-
-
lb
$11,004
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes