IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 3634 Electric Housewares And Fans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0088 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,129 $727 Not Implemented
MO0088 # 09 Y:1993 09 1993 PAY UTILITY BILLS ON TIME $985 $0 Implemented
OR0149 # 01 Y:1992 01 1992 INSTALL SET-BACK TIMERS $1,784 $0 Implemented
OR0149 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $0 Implemented
OR0149 # 03 Y:1992 03 1992 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,907 $2,071 Implemented
OR0149 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $288 $200 Implemented
OR0149 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $1,000 Implemented
OR0149 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $182 $858 Implemented
OR0149 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $1,929 $3,837 Implemented
MO0021 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,969 $1,195 Implemented
MO0021 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $1,316 Implemented
MO0021 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,061 $5,968 Implemented
MO0021 # 04 Y:1991 04 1991 INSULATE BARE EQUIPMENT $3,394 $6,952 Implemented
MO0021 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $961 $0 Implemented
MO0021 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $1,577 $4,250 Implemented
MO0021 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,114 $435 Implemented
MO0021 # 08 Y:1991 08 1991 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $289 $700 Implemented
MO0018 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,073 $542 Implemented
MO0018 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,564 $1,000 Implemented
MO0018 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $757 Implemented
MO0018 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $315 Implemented
MO0018 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $469 $700 Implemented
TN0323 # 01 Y:1987 01 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,914 $0 Implemented
TN0323 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,487 $520 Implemented
TN0323 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $1,200 Implemented