IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3639 Household Appliances, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0298 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,862 $9,000 Implemented
TT0298 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,545 $31,800 Implemented
TT0298 # 06 Y:2023 06 2023 ADOPT IN-HOUSE MATERIAL GENERATION $20,290 $61,440 Not Implemented
TT0298 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,983 $9,000 Implemented
TT0298 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $13,500 Implemented
TT0298 # 05 Y:2023 05 2023 ISOLATE HOT OR COLD EQUIPMENT $25,424 $60,000 Not Implemented
TT0298 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,325 $22,800 Not Implemented
TT0298 # 13 Y:2023 13 2023 RECOVER WASTE HEAT FROM EQUIPMENT $3,689 $9,000 Not Implemented
TT0298 # 01 Y:2023 01 2023 MINIMIZE WATER USAGE $54,343 $42,000 Implemented
TT0298 # 03 Y:2023 03 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $26,893 $45,000 Not Implemented
TT0298 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $32,300 $196,225 Not Implemented
TT0298 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $26,094 $85,000 Not Implemented
TT0298 # 12 Y:2023 12 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,575 $2,010 Implemented
TT0297 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,703 $203,650 Not Implemented
TT0297 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $735 $750 Not Implemented
TT0297 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $8,533 $20,000 Implemented
TT0297 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $11,161 $14,500 Implemented
TT0297 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,890 $1,250 Not Implemented
TT0297 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,512 $6,000 Implemented
TT0297 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $1,950 Implemented
TT0297 # 07 Y:2023 07 2023 REUSE RICH WHITE WATER IN OTHER APPLICATIONS $1,230 $1,820 Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented