Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 3639 | Household Appliances, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0298 # 13 Y:2023 | 13 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,689 | $9,000 | Not Implemented |
TT0298 # 01 Y:2023 | 01 | 2023 | MINIMIZE WATER USAGE | $54,343 | $42,000 | Implemented |
TT0298 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,300 | $196,225 | Not Implemented |
TT0298 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $26,893 | $45,000 | Not Implemented |
TT0298 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $26,094 | $85,000 | Not Implemented |
TT0298 # 05 Y:2023 | 05 | 2023 | ISOLATE HOT OR COLD EQUIPMENT | $25,424 | $60,000 | Not Implemented |
TT0298 # 06 Y:2023 | 06 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $20,290 | $61,440 | Not Implemented |
TT0298 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,545 | $31,800 | Implemented |
TT0298 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,325 | $22,800 | Not Implemented |
TT0298 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,862 | $9,000 | Implemented |
TT0298 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $13,500 | Implemented |
TT0298 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,983 | $9,000 | Implemented |
TT0298 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $2,010 | Implemented |
TT0297 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,890 | $1,250 | Not Implemented |
TT0297 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $735 | $750 | Not Implemented |
TT0297 # 07 Y:2023 | 07 | 2023 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $1,230 | $1,820 | Implemented |
TT0297 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,512 | $6,000 | Implemented |
TT0297 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,428 | $1,950 | Implemented |
TT0297 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,533 | $20,000 | Implemented |
TT0297 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $11,161 | $14,500 | Implemented |
TT0297 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,703 | $203,650 | Not Implemented |
TT0233 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $565 | $1,450 | Not Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0233 # 05 Y:2020 | 05 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,206 | $22,392 | Not Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |