IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0483 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,574 $20,000 Implemented
LE0483 # 04 Y:2019 04 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,605 $12,900 Not Implemented
LE0483 # 03 Y:2019 03 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,352 $12,000 Not Implemented
LE0483 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,044 $11,000 Not Implemented
LE0483 # 01 Y:2019 01 2019 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $200 $40 Implemented
HO0180 # 02 Y:1998 02 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,852 $0 Not Implemented
HO0180 # 03 Y:1998 03 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,004 $1,000 Implemented
HO0180 # 04 Y:1998 04 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $36,720 $30,000 Not Implemented
HO0180 # 01 Y:1998 01 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $3,722 $0 Not Implemented
HO0073 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $200 Not Implemented
HO0073 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $475 Implemented
HO0073 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $2,802 Implemented
HO0073 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,474 $6,062 Implemented
HO0073 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $123 $204 Implemented
HO0073 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $324 $790 Implemented
RU0107 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,432 $200 Not Implemented
RU0107 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,159 $500 Not Implemented
RU0107 # 05 Y:1991 05 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $217 $59 Not Implemented
RU0107 # 06 Y:1991 06 1991 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $78,180 $0 Not Implemented
RU0107 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,833 $407 Not Implemented
RU0107 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $933 $0 Not Implemented
RU0078 # 02 Y:1990 02 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,842 $0 Implemented
RU0078 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $3,507 $0 Not Implemented
RU0078 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $251 $102 Not Implemented
RU0078 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,019 $1,880 Not Implemented