IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0450 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $860 Implemented
TN0450 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $788 $300 Implemented
TN0450 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $316 Implemented
TN0450 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $706 $890 Implemented
TN0450 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,058 $0 Implemented
TN0450 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Implemented
TN0368 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,877 $0 Not Implemented
TN0368 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,310 $2,994 Not Implemented
TN0368 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,212 $7,800 Not Implemented
TN0368 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,470 $1,190 Not Implemented
TN0368 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,946 $1,470 Not Implemented
TN0368 # 06 Y:1989 06 1989 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,287 $25,000 Not Implemented
TN0368 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,013 $0 Not Implemented
TN0368 # 08 Y:1989 08 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,328 $450 Not Implemented
TN0368 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $319 $360 Not Implemented
TN0279 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,570 $4,000 Not Implemented
TN0279 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,298 $648 Not Implemented
TN0279 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,339 $0 Implemented
TN0279 # 04 Y:1986 04 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,223 $0 Not Implemented
TN0279 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,285 $0 Not Implemented
TN0279 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,106 $39,200 Not Implemented
TN0218 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,078 $4,350 Not Implemented
TN0218 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $180 Not Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,382 $0 Not Implemented