Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 364 | Electric Lighting And Wiring Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0450 # 01 Y:1992 | 01 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,646 | $860 | Implemented |
TN0450 # 02 Y:1992 | 02 | 1992 | IMPROVE LUBRICATION PRACTICES | $788 | $300 | Implemented |
TN0450 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $414 | $316 | Implemented |
TN0450 # 04 Y:1992 | 04 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $706 | $890 | Implemented |
TN0450 # 05 Y:1992 | 05 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,058 | $0 | Implemented |
TN0450 # 06 Y:1992 | 06 | 1992 | OPTIMIZE PLANT POWER FACTOR | $4,400 | $9,000 | Implemented |
TN0368 # 01 Y:1989 | 01 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,877 | $0 | Not Implemented |
TN0368 # 02 Y:1989 | 02 | 1989 | INSULATE BARE EQUIPMENT | $4,310 | $2,994 | Not Implemented |
TN0368 # 03 Y:1989 | 03 | 1989 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,212 | $7,800 | Not Implemented |
TN0368 # 04 Y:1989 | 04 | 1989 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,470 | $1,190 | Not Implemented |
TN0368 # 05 Y:1989 | 05 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,946 | $1,470 | Not Implemented |
TN0368 # 06 Y:1989 | 06 | 1989 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $6,287 | $25,000 | Not Implemented |
TN0368 # 07 Y:1989 | 07 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,013 | $0 | Not Implemented |
TN0368 # 08 Y:1989 | 08 | 1989 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,328 | $450 | Not Implemented |
TN0368 # 09 Y:1989 | 09 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $319 | $360 | Not Implemented |
TN0279 # 02 Y:1986 | 02 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,570 | $4,000 | Not Implemented |
TN0279 # 06 Y:1986 | 06 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,298 | $648 | Not Implemented |
TN0279 # 05 Y:1986 | 05 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,339 | $0 | Implemented |
TN0279 # 04 Y:1986 | 04 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,223 | $0 | Not Implemented |
TN0279 # 03 Y:1986 | 03 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,285 | $0 | Not Implemented |
TN0279 # 01 Y:1986 | 01 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,106 | $39,200 | Not Implemented |
TN0218 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,078 | $4,350 | Not Implemented |
TN0218 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,746 | $180 | Not Implemented |
TN0218 # 03 Y:1984 | 03 | 1984 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,352 | $3,700 | Implemented |
TN0218 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,382 | $0 | Not Implemented |