IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,222

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $640 Not Implemented
TT0224 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $40 Not Implemented
IP0109 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,423 $0 Implemented
IP0109 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $59 Implemented
IP0109 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,901 $2,251 Not Implemented
IP0109 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,301 $51,647 Implemented
IP0109 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,506 $1,246 Not Implemented
IP0109 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,342 $5,885 Implemented
IP0109 # 07 Y:2018 07 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,448 $205,000 Not Implemented
MI0320 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $58,668 $31,800 Not Implemented
MI0320 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $58,406 $120 Implemented
MI0320 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $53,871 $1,660 Implemented
MI0320 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,560 $27,600 Implemented
MI0320 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $23,860 $3,600 Implemented
MI0320 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $18,035 $23,565 Implemented
MI0320 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,588 $2,300 Not Implemented
MI0320 # 08 Y:2017 08 2017 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $3,716 $6,530 Not Implemented
MI0320 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,100 $2,272 Not Implemented
MI0320 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $425 $134 Not Implemented
GT0895 # 01 Y:2017 01 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $35,273 $4,360 Not Implemented
GT0895 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,819 $4,560 Not Implemented
GT0895 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $4,720 $11,140 Implemented
GT0895 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,229 $85,688 Implemented
GT0895 # 05 Y:2017 05 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $110,000 $429,000 Not Implemented